Covered Tasks

Task 01.00 - Abandon / Deactivate Pipeline

Task 02.00 - Conduct Pipe to Soil Cathodic Survey

Task 03.00 - Inspect Cathodic Rectifiers

Task 04.00 - Install / Maintain Cathodic Test Leads

Task 05.00 - Inspect / Remediate Atmospheric Corrosion

Task 06.00 - Inspect Exposed Pipe

Task 07.00 - Inspect Internal Sections of Pipeline

Task 08.00 - Test for Electrical Interference & Isolation

Task 09.00 - Inspect Security Devices

Task 10.00 - Patrol Pipeline Right of Way

Task 11.00 - Inspect/Maintain/Operate Pipeline Isolating Valves

Task 12.00 - Pipeline Repairs

Task 13.00 - Inspect/Test/Calibrate Pressure Limiting Devices

Task 14.00 - Locate and Mark Pipelines

Task 15.00 - Inspect/Test Electrical Bonds

Task 16.00 - Purge Pipeline or Equipment

Task 17.00 - Confirm Materials Used for Pipeline Repairs

Task 18.00 - Pressure Test the Pipeline

Task 19.00 - Operate the Pipeline During Normal Operations

Task 20.00 - Operate the Pipeline During an Emergency

Task 21.00 - Install Cathodic Equipment on the Pipeline

Task 22.00 - Supervise Non-Qualified Workers

Task 23.00 - Install/Maintain Pipeline Markers

Task 24.00 - Conduct Over the Line Leakage Survey

Task 25.00 - Conduct Thickness Testing

Task 26.00 - Hot Tap the Pipeline

Task 27.00 - Inspect Corrosion Coupons

Task 28.00 - Maintain Natural Gas Compressor Stations

Task 29.00 - Operate Natural Gas Compressor Stations

Task 30.00 - Test/Maintain Remote Compressor ESD Devices

Task 31.00 - Conduct Odorant Test

Task 32.00 - Service/Maintain Odorizing Equipment

Task 33.00 - Inspect/Maintain Vaults

Task 34.00 - Uprate MAOP of Pipeline System

Task 35.00 - Respond to Minor Leaks on Pipeline

Task 36.00 - Remove Hydrates in Pipeline

Task 37.00 - Test Compressor Fire Eyes

Task 38.00 - Repair/Replace Communications Devices

Task 39.00 - Convert Pipeline Service

Task 40.00 - Pipeline Batching Operations

Task 41.00 - Inspect Pipeline Farm Taps

Task 42.00 - Calibrate Gas Detectors

Task 43.00 - Calibrate Pressure Control I/P

Task 44.00 - Joining Plastic Pipe

Task 45.00 - Launching/Receiving Pigs

Task 46.00 - Operate/Repair Chemical Injection Pumps

Task 47.00 - Inspect Underwater Pipeline